Calc Stop Date~

From VistApedia
Revision as of 21:18, 15 April 2006 by Jeannette (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
Calc Stop Date
Calculated Stop Date. This is the date that would have been the default Stop Date/Time for an order if no duration was received from CPRS. Due to the existence of a duration, the default Stop Date/Time of the order becomes the expected first dose plus the duration.


Source: Inpatient Medications V. 5.0 Nurse’s User Manual


This is a Glossary term from the VistA Documentation Library